STEP 27
Tighten xture coupler set screws using supplied 3/32” Allen wrench. Fixture coupler set screws have
thread lock already applied at factory. See Diagram K.
STEP 28
Apply supplied liquid thread lock (part D) to all ttings including xture coupler and screw collar loop
ttings.
Never attach the chandelier to the ALL1000 improperly. Failure to secure the xture coupler set screws
and properly apply thread lock could cause the chandelier to fall, which could cause death, personal
injury, and/or property damage.
STEP 29
Replace canopy and bottom screw collar ring. Conrm top of canopy is just below edge of bottom contact
plate. See Diagram K.
Never allow the chandelier canopy to make contact with the ceiling before the contact plates meet. is
could interfere with the automatic shuto system and could cause the chandelier to fall, which could
cause death, personal injury, and/or property damage.
STEP 30
Conrm winch cable still hangs plumb through center of hole in top contact plate on ceiling box. See
STEP 9 and Diagram E.
STEP 31
Operate ALL1000 to the CEILING POSITION. Test lights and call Aladdin Light Lift (877) 287-4601
with any questions regarding installation and/or operation of ALL1000.
Bottom Screw Collar Ring
Canopy
Tighten Set
Screws with
3/32” Allen
Wrench
Top of Canopy
Just Below Edge
of Bottom
Contact Plate
Diagram K
Commentaires sur ces manuels