ALL1000RM-230V INSTALLATION INSTRUCTIONSAladdin Light Lift, Inc. (256) 429-970061 Shields Road (877) 287-4601Huntsville, AL 35811 www.a
STEP 13After turning o power, remove and discard existing electrical box if present in ceiling. Only use ceiling box provided with ALL1000RM.Never r
STEP 17Attach conduit assembly to 3/4” conduit connector mounted below chandelier pulley. Once completely inserted, tighten set screw on conduit conn
STEP 20Loosely fasten chandelier pulley assembly to suitable structure using 7/16” x 4” hex tap bolts, 7/16” nylon lock nuts and 3/8” USS at washers.
STEP 22Shim and adjust chandelier pulley assembly so that winch cable hangs plumb through center of hole in top contact plate on ceiling box. See Dia
STEP 25Turn o supply power before wiring ALL1000RM light switch. Turn o light switch in square box. Wire light switch with 230V wiring. e 230V l
STEP 26Run controller wire in to single gang box for Keyswtich Controller or optional SmartLift Controller. Chandelier must be visible from controll
STEP 31Fully thread screw collar loop or threaded stem that was supplied with chandelier to 3/8 IPS(16mm) xture coupler. If chandelier was supplied
STEP 34Adjust screw collar rings so top of canopy is just below edge of bottom contact plate. Canopy should be at least 4.4cm deep. See Diagram R.Ne
STEP 38Tighten xture coupler set screws using supplied 3/32” Allen wrench. Fixture coupler set screws have thread lock already applied at factory.
STEP 41Conrm winch cable still hangs plumb through center of hole in top contact plate on ceiling box. See STEP 22 and Diagram M.STEP 42Operate ALL1
Read the following guidelines prior to installing the ALL1000RM:I. e ALL1000RM must be installed by a licensed, bonded, and insured electrician. II.
ALL1000RM TROUBLESHOOTING GUIDETECH SUPPORT: (877) 287-4601 Monday through Friday 8:00am to 4:00pm US CSTI. Troubleshooting and installation must be
ALL1000RM TROUBLESHOOTING GUIDE cont. 1. Conrm ALL1000RM is at the CEILING POSITION. If not, use the controller to operate the ALL1000RM to the CEI
ALL1000 RM Hardware Box List5/16” USS Flat Washers (QTY 4)3/8” x 1¼” Hex Tap Bolts (QTY 2)Flat Brackets (QTY 2) per directional pull
STEP 1Determine mounting location of ALL1000RM motor assembly. e ALL1000RM may be mounted on an angle, vertically, horizontally or upside down, if s
STEP 3Determine mounting location of directional pulleys if they are to be installed with ALL1000RM. Directional pulleys can be used to change winch
STEP 6Position ALL1000RM motor assembly where it will be mounted. Adjustments can be made loosening 3/8” channel strut bolts that hold ALL1000RM moto
STEP 8Turn o supply power before wiring ALL1000RM motor switch. Turn o motor switch in square box. Wire motor switch with 230V wiring. e 230V mot
STEP 9Remove dust cover by using 5/16” nutdriver or socket. Remove paper tape from winch drum while keeping tension on winch cable.Never operate the
Diagram HRemove Dowel Pin Grooved End FirstInsert Dowel Pin Smooth End FirstFixture CouplerTemporary WeightBottom Contact Plate AssemblyWinch Cable
Commentaires sur ces manuels